Mejor Rendimiento de su Explosión - Ahorros en sus Costos Aguas Abajo.


   



 MOCAP, Inc.
 13100 Manchester Rd.
 St. Louis, MO 63131
 USA

 Email
 314-543-4000 phone
 314-543-4111 fax
 800-633-6775

 Llamadas Internacionales:
 001-314-543-4000



   Patente # 5,936,187

Stemming Performance Study Video

This video is of our Stemming Performance Study (Field Study 3) conducted in September 2003 by DBA Consulting.

As you view the video, please pay particular attention to the difference in stemming retention between the left side of the shot vs. the right side of the shot.

Left side of video

  • 39ms = Average retention time of crushed rock, stemmed holes 
    (no VARI-STEM)

Right side of video

  • 120ms = Average retention time of VARI-STEM with crushed rock
  • 145ms = Average retention time of VARI-STEM with sand consistent drill cuttings

Also please note the more pronounced, deeper Energy Trough. The trough extends deeper towards the toe of the wall on the right side of the shot where our VARI-STEM Plugs were used.  A deeper energy trough results in better diggabilty.

This video is compatible with windows media player 7 and above. If you cannot see this video, please visit either Download.com or Microsoft.com for a newer version of this player.

Click anywhere in the black box or on the PLAY arrow below to start the video.